Mammoet and Allseas have simultaneously installed two offshore platforms in the North Sea for the first time. The dual-crane operation required precise coordination of lifting operations and coordination between the crane lifting equipment of both companies. The parallel installation reduces project timelines and downtime of the specialized vessels used. Details on lifting loads and crane capacities deployed were not published.
This article was created with AI assistance and editorially reviewed.

